Belfast Transport Hub, on behalf of Farrans Sacyr JV for Translink, £300m, 2021-2023.
Procter and Street include team members who have extensive experience and knowledge working in the WasteWater sector on major Captial Delivery projects for United Utilities. Our Design Manager Luke Kolakowski was able to work with our Client, Bethell Civils, to develop concept proposals through the detailed design to a start on site. The deisgn had various Technical Assurance Process reviews with United Utilities for four Design and Build Contracts with total project values in excess of £30m.
Benefits.
Tender writing
Collaboration lead
Joint Venture collaboration support
ISO44001 Relationship Management Plan
Team building
Training and 1-2-1 mentoring
Embedment of collaboration tools and techniques
Facilitation
Review and measurement
Handover and knowledge transfer from tender to a local employee
Procter and Street played an important part in the successful win on BTH, and have provided also a valuable asset during the early stages of construction by leading the collaboration and interface management procedures.
I would highly recommend them based on my experience so far on BTH.
Project Director, Saycr
July 2022
Comments